As PFAS testing continues to expand, laboratories face increasing pressure to deliver reliable results at lower detection limits and faster turnaround times. While much of the conversation focuses on analytical methods and regulations, maintaining instrument performance and minimizing downtime are equally critical to success.
Tags
PFAS FAQ’s: Ask our experts
As PFAS testing continues to expand, laboratories face increasing pressure to deliver reliable results at lower detection limits and faster turnaround times. While much of the conversation focuses on analytical methods and regulations, maintaining instrument performance and minimizing downtime are equally critical to success.
Loss the contact closure signal
our 7600 couple with nanoLC Ultimate 3000 via contact closure. it has run without any loss connection during the batch. Just yesterday, the last injection keep equilibrating system until the LC finished the gradient run. We closed the software and power off LC and MS then started again but it did not help. The Dionex engineer also checked their LC and triggerring cable found both are ok.
No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.